Artemis briefingFri Oct 232:00 PM ET, Kennedy Space Center
RFP Daily
CLDC proposalsDue Dec 880JSC027R0004
Thursday, October 22, 2026Tracking every dollar the world spends to leave it, every day.rfpdaily.com

Space RFP Tracker | 2026 Celestial Procurement

RFP Daily tracks every active solicitation, contract award, and procurement pipeline shaping the space economy. From NASA Artemis and Space Force constellations to ESA lunar landers and DARPA cislunar programs, we publish the daily record of humanity's off-world investment. Browse the Top Solicitations ranked by value, follow active lunar bids, or watch the live ABOI feed for real-time updates.

Closing & Award
Nov 23
RMWT Ground Entry Points

The Missile Warning Layer Needs Ground

FA240126R0003 · Space Force
Proposals due Nov 23, 2026
$1.75B

AMDT3: $1.75B for 36 Golden Dome Missile-Tracking Satellites

Awarded Jul 2026
SeriesTo the Moon and Beyond
Artemis 2026

We're Going to the Moon

Artemis is a sustained campaign to build permanent infrastructure on and around the Moon, establish resource extraction capabilities, and lay the economic foundation for deep-space operations. It is not a replay of Apollo. The series runs from the April 2026 launch of Artemis II, the first crewed mission to lunar orbit in over fifty years, through the contracts that will build the base.

Series · 7 live · 17 in devRead the series →
  1. 02

    Why Did We Go Originally?

    Apollo was a geopolitical instrument, not a science program. The real reason we went explains why we stopped.

  2. 03

    Why Go Back?

    Water ice changes the economics. The Moon is no longer just a destination; it is a gas station.

  3. 04

    Multistage Rockets

    From Saturn V to SLS to Starship. The physics hasn't changed; the engineering has.

  4. 05

    Updates to the Capsule

    Orion is not a modernized Apollo. It is a clean-sheet design that happens to use the same shape.

  5. 06

    The Artemis Missions

    Five flights. From flyby to surface base. Every mission generates procurement across multiple verticals.

  6. 07

    The Artemis Treaty

    77 nations have signed. China and Russia have not. The Accords shape who gets contracts and who gets left out.

  • 1
    Commercial LEO Destinations | NASA Puts the Station Contracts Out for Bid
    Request for proposal 80JSC027R0004 from Johnson Space Center for the Commercial LEO Destination Contract, the commercial space stations meant to follow the ISS. NASA describes a firm-fixed-price, multiple-award IDIQ with at least two awardees for early development. NAICS 336414. NASA announced the final RFP October 9 and it posted to SAM October 15. Proposals are due December 8, 1:00 PM CT; NASA expects awards in spring 2027.
  • 2
    Tracking Layer Tranche 4 | SDA Asks About On-Orbit Demonstrations
    Special notice SDA-SN-27-0003, a request for information on on-orbit demonstrations and operations for Tranche 4 of the Tracking Layer, the missile warning and tracking constellation. NAICS 541715, no set-aside listed. Responses are due December 4, noon ET.
  • 3
    Lunar Exploration Ground Sites | NASA Intends to Sole Source the Partnership
    Presolicitation 80GRC027R0003 from Glenn: NASA intends to sole source a public-private partnership for Lunar Exploration Ground Sites, the Earth-side antenna sites planned for lunar mission communications. Other interested sources have until October 30, 3:00 PM ET to respond.
  • 4
    RMWT Ground Entry Points | The Missile Warning Layer Needs Ground
    Request for proposal FA240126R0003 for ground entry points serving the Resilient Missile Warning Tracking low Earth orbit constellation. NAICS 541715, no set-aside. Proposals were due November 2; an October 13 update moved the due date to November 23, 4:00 PM ET. This is a solicitation, not a market survey.
  • 5
    MOBY | NOAA Moves the Ocean Color Buoy to a Presolicitation
    Presolicitation 1332KP27R0001 for the Marine Optical BuoY, the vicarious calibration reference for NOAA satellite ocean color systems. It posted October 14, the day before the earlier sole-source notice closed. NAICS 541715. Responses are due October 30, 4:00 PM ET.
  • 6
    Space Warfighting Architecture Navigator | Space RCO Asks Industry
    Sources sought SPRCORFI27001 from the Space Rapid Capabilities Office at Kirtland AFB: a request for information on a Space Warfighting Architecture Navigator. NAICS 541611. Responses are due November 13, 5:00 PM MT.
  • 7
    ROSES25 D.8 | Habitable Worlds Observatory Precursor Science
    The precursor science element for the same observatory. Precursor science is the target list: which stars are worth pointing a ten-billion-dollar telescope at, decided before the telescope exists.
  • 8
    RPOC VI | Rendezvous, Proximity Operations and Capture, Next Round
    Sources sought 80JSC027RPOC6 from Johnson Space Center for Rendezvous, Proximity Operations and Capture VI. A separate notice the same day, 80JSC023DA007, raises the ceiling on the current RPOC-V contract. NAICS 541330. Responses are due October 28, 5:00 PM CT.
  • 9
    Spacecraft Electrical Power Systems | Pre-RFI Market Research
    JPL sources sought SBPO-2610-03092026, NAICS 336414, reposted October 6 with the close moved from October 2 to October 30, 3:00 PM PT. The notice asks for small businesses with demonstrated experience across the power lifecycle, naming solar arrays, batteries, power electronics and distribution, high-power and high-voltage systems, direct-drive architectures, and energy storage. Experience with solar array degradation and with power interactions with electric propulsion is called out as particularly relevant. Responses to the JPL Small Business Programs Office.
  • 10
    Chemical and Electric Propulsion Systems | Pre-RFI Market Research
    JPL sources sought SBPO-2610-01092026, the twin of the power notice above, same NAICS, reposted the same day to the same October 30 close. It seeks small businesses across propulsion system architecture, thruster and feed-system design, modeling and simulation, power processing and propellant systems, fabrication, environmental and performance testing, and failure analysis. Hall thrusters, plasma diagnostics, vacuum facilities, and plume interaction testing are called out.
  • 11
    High-Performance Space Computing | Pre-RFI Market Research
    JPL sources sought SBPO-2610-09012026, the third of the three notices first posted September 1 and reposted October 6 to an October 30 close. It seeks small businesses working in HPSC-based processors and single-board computers, SOSA S3C and SpaceVPX architectures, plug-in cards and chassis, high-speed networking and data interfaces, flight software, and hardware and software integration. Experience carrying a development system through to flight-qualified hardware is called out as particularly relevant.
  • 12
    More Payload Processing on North Wallops Island
    Special notice RFI-WFF-PayloadProcessing-2026. Payload processing capacity is the quiet bottleneck at a launch site: a range can host more launches than it can prepare spacecraft for, and Wallops is asking industry how to widen it. Amendment 01 adds an industry day and registration instructions.
  • 13
    PEREGRINE Sentry | SDA Surveys Its Ground Environment
    Sources sought SDA-SN-26-0016 for PEREGRINE Sentry, the Performance Enhanced Real-time Ground Environment. NAICS 541715, no set-aside listed. Responses are due October 30, 5:00 PM ET.
  • 14
    KOSMOSS | Sustaining the Space Domain Awareness Kill-Web
    Kill-web Operations Sustainment and Maintenance of Space Domain Awareness Systems. A July 17 update says the government now plans to use existing contract vehicles such as multiple-award IDIQs instead of creating its own, competing each requirement separately as task orders spread over the next few years.
  • 15
    ROSES25 C.4 | Planetary Science Enabling Facilities
    The facilities element under ROSES 2025 planetary science. Enabling facilities are the sample curation labs, the analog test beds, and the instrument development shops that every planetary mission draws on and no single mission funds.
  • 16
    A United States Space Academy | NASA Asks How to Build One
    Special notice NASA-USSA-RFI: NASA asks for information on creating a United States Space Academy. NAICS 531. Responses are due November 16, 5:00 PM CT.
  • 17
    System Delta 84 | Missile Warning and Tracking, MEO Epochs 3 and 4
    FA8810-RFI-26-SYD84-E3E4. The medium Earth orbit layer of the missile warning and tracking architecture, two epochs out. MEO is the orbit the tracking mission moved to when GEO stopped being survivable.
  • 18
    Atmospheric Exploration Observatory | NASA Asks for Partners
    Announcement for Partnership Proposals NNH26ZDA015L, Atmospheric Exploration Observatory, from NASA Headquarters. NAICS 54171, no set-aside. Partnership proposals are due December 2, 4:00 PM CT.
  • 19
    Deep Space Autonomous Robotics Challenge | NASA Wants a Host Facility
    Sources sought 80JSC024R0004: NASA is looking for facilities to host the Deep Space Autonomous Robotics Challenge. NAICS 541990. Expressions of interest are due January 31, 2027, 5:00 PM ET.
  • 20
    PWSA Systems, Technologies and Emerging Capabilities
    FA240126S0001, the Proliferated Warfighter Space Architecture BAA. Open for another eighteen months, which makes it the longest runway on this page.
  • 21
    Commercial Space Domain Awareness | The Training LLM Module Is Off
    FA882026PKLBAS2. A July 17 update from Space Systems Command says the Space Force program office appreciated the sources sought submissions but is no longer pursuing the commercial large language model module for space domain awareness training.
  • 22
    Unified Messaging System | $33.1M More for L3Harris
    Modification P00380 to FA8823-20-C-0004 adds $33,141,075 to the L3Harris Unified Messaging System contract, raising its cumulative face value to $1,527,155,327. Work is at Colorado Springs and Vandenberg SFB and is expected to finish in October 2028. DoD announced the award October 13, said October 14 it had not been released, and confirmed October 16 that it was awarded that day.
  • 23
    UK Active Debris Removal | ClearSpace Takes the Prime
    The UK Space Agency named ClearSpace prime for the UK Active Debris Removal mission, which will remove two defunct UK-registered satellites. ClearSpace puts the contract at GBP 61M. Operations are targeted for 2029, subject to launch scheduling.
  • 24
    AMDT3: $1.75B for 36 Golden Dome Missile-Tracking Satellites
    L3Harris ($955M) and Sierra Space ($798M) won fixed-price OTAs to build 36 accelerated Tranche 3 Tracking Layer satellites by the end of 2028 in support of Golden Dome for America. Schedule compression stacked on the existing constellation.
  • 25
    Protected Tactical SATCOM-Global: First Operational Satellites
    Viasat and Intelsat split $437.7M for the first two operational GEO Protected Tactical SATCOM-Global birds, standing up a new global anti-jam tier of the protected-tactical family beyond the earlier design-phase picks.
  • 26
    GPS IIIF SV23-24: Two More Resilient Navigation Satellites
    A $514M add put two more GPS IIIF space vehicles on contract with Lockheed Martin, bringing the run to 14 and locking the Regional Military Protection anti-jam upgrade as the baseline path for position, navigation, and timing.