2026 in focusMars5 events this year
RFP Daily
Act nextDec 11P.L. 119-103 (H.R. 6500)
Thursday, October 22, 2026Mars is not a dream. It's a line item.rfpdaily.com
Key insight, 2026MSR unfunded in FY2026 law Jan 23; SR-1 Freedom announced Mar 24 for a Dec 2028 launch; MTN awarded Sep 1, delivery due Dec 31, 2028

With MSR unfunded, NASA's 2026 Mars commitments went to a fixed-price commercial relay and a nuclear demonstrator both pinned to December 2028, so subcontract positioning outranks waiting for a flagship.

Source: NASA news releases and SR-1 Freedom mission page; SpacePolicyOnline
The year 2026
  1. JanJan 23, 2026

    The President signed the FY2026 minibus (H.R. 6938), which left Mars Sample Return unfunded and put $110 million into a Mars Future Missions technology line.

  2. MarMar 24, 2026

    NASA announced SR-1 Freedom, a nuclear-electric spacecraft built on Gateway's Power and Propulsion Element, for a December 2028 Mars launch carrying the SkyFall helicopters.

  3. SepSep 1, 2026

    NASA selected Blue Origin for the Mars Telecommunications Network, a firm-fixed-price contract worth up to about $700 million with orbiter delivery due by December 31, 2028.

  4. SepSep 11, 2026

    Rocket Lab filed a GAO bid protest of the MTN award, arguing the selection was inconsistent with the eligibility criteria Congress set.

  5. OctOct 19, 2026

    JAXA launched Martian Moons eXploration (MMX), a Phobos sample-return mission, on an H3 from Tanegashima, with Mars orbit arrival planned for August 2027.

Mars RFP Tracker | Red Planet Contracts & Procurement

The Mars page tracks every active and pending solicitation for Mars exploration, from robotic mission procurements and ISRU technology development to human architecture studies and sample return planning. Browse active Mars solicitations, follow the robotic mission pipeline, or explore Mars ISRU programs. For the full ranked view across all destinations, visit the 2026 tracker. For real-time bid updates, watch the live ABOI feed.

Latest Analysis

EDITORIAL STEM
NASAopen
Mars Sample Return | What Replaces the $11B Plan
$110M redirectMSR cancelled
Congress eliminated the $11B Mars Sample Return campaign and ESA cancelled the Earth Return Orbiter. $110M survives in a Mars Future Missions line. What architecture rises from the rubble, and which contractors it carries.
EDITORIAL STEM
NASAopen
SR-1 Freedom | America's First Nuclear Spacecraft
~$1B+Mars launch 2028
NASA's first nuclear-powered interplanetary spacecraft targets a December 2028 Mars launch on a bus built from Gateway's Power and Propulsion Element. The reactor is not yet built, which leaves the reactor and integration work as the open seats in space nuclear.
EDITORIAL STEM
CNSAopen
Tianwen-3 | China's the Only One Still Going for Mars Rocks
Only funded MSRLaunch ~2028
With the Western sample-return architecture collapsed, China's Tianwen-3 is now the only funded mission to bring Mars rocks home. The geopolitics of who holds the first samples just shifted east.
EDITORIAL STEM
NASA / ROCKET LABopen
ESCAPADE | New Glenn's First Mars Science Delivery
$80M twin probesMars arrival 2027
Two small spacecraft launched on New Glenn's second flight on November 13, 2025, headed for Mars orbit in 2027 to study how the solar wind strips the atmosphere. The model for cheap, fast planetary science under a tight cap.
EDITORIAL STEM
ESA / NASAopen
Rosalind Franklin | NASA Launches ESA's Rover
~$1.8BLaunch late 2028
Europe's Mars rover, rebuilt after the Russia partnership collapsed, now flies on a NASA-procured vehicle in 2028 with a two-meter drill. A growing model where NASA brokers launches for allied science.
EDITORIAL STEM
DARPA / NASAopen
DRACO Cancelled | Nuclear Thermal Loses Its Flight Demo
Programmed outDemo cancelled
The DRACO nuclear thermal propulsion flight demo was cancelled, sending General Atomics and Standard Nuclear teams toward SR-1 support or DoD work. The first US nuclear propulsion test since NERVA slips again.
EDITORIAL STEM
JAXAactive
MMX | JAXA's Race to Phobos and Back
~$450MLaunched Oct 19, 2026
JAXA's Martian Moons eXploration launched October 19 on an H3 from Tanegashima for a Phobos sample return, with Mars arrival planned for August 2027 and Earth return for 2031. NASA supplied the MEGANE instrument and the P-Sampler and receives at least 15% of the returned samples.
EDITORIAL STEM
NASAopen
Mars Future Missions | Where the $110M Redirect Goes
$110M lineRolling
The technology-continuity account that absorbed the MSR redirect. Where the money actually flows, from ISRU precursors to sample-return alternatives, and the BAA or SBIR tranche it implies.
EDITORIAL STEM
NASAopen
MOXIE's Orphan | Oxygen on Mars With No Follow-On
Proven, unfundedNo successor
MOXIE made oxygen from Mars air at twice its design rate, then ended with no funded successor. Five orders of magnitude separate the demo from what a crew needs. The scale-up nobody has bought yet.